• 0 Posts
  • 15 Comments
Joined 1 year ago
cake
Cake day: August 2nd, 2023

help-circle










  • Solar plus batteries are already cheaper than nuclear, and only going down. Nuclear has always gotten more expensive over time. For the cost of the most recently completed nuclear plant in the US they could have built 12 times the nameplate capacity worth of solar with 24 hours of battery backup. (A totally unnecessary amount of dispatchability.)

    Solar and batteries easily “pay” for their manufacturing carbon emissions within 1-2 years max (as does nuclear). This payback period only goes down as the grid gets greener.





  • The nameplate cost of this plant is $32 per watt. Even at smaller scales, utility-scale solar plants are $1 per watt. Do you know how many grid storage batteries you could buy with the extra $31 per watt? (6 hour storage is around $2.50 per watt or $.40/Wh.) You could build a solar plant 4x the nameplate capacity of the nuke (in order to match the capacity factor), and add 24 hours of storage to make it fully dispatchable, and still have enough money left over to build 2 more of the same thing. This doesn’t even include the fact the nuclear has fuel costs, waste disposal, higher continued operational costs, and unaccounted publicly involuntarily subsidized disaster insurance.