Nuclear fuel in the reactor cores melted after the magnitude 9.0 earthquake and tsunami in March 2011 caused the Fukushima Daiichi nuclear plant's cooling systems to fail
Wind Turbine’s problems is we have to replace the blades every 3-7 years depending on the model and there is no good way to recycle or break down the fiberglasse components. So every every 3-7 years you have 3 XL tractor truck trailer size turbine blades going into landfills.
Wind and Solar are still good, don’t get me wrong, but lets not pretend they have no downsides or drawbacks.